Usage permit: when it is required and when it is not

Share
Muškarac u plavoj košulji drži model dokumenta uz maketu kuće s crvenim krovom, kao prikaz dokumentacije potrebne za uporabu građevine

A usage permit is a document that buyers most often check too late, when the deposit has already been paid and the contractual deadlines are running. Until then, the right question usually hasn't even been asked, because the seller says everything is legal, which sounds sufficient.

The rules are clear and boil down to three dates. One of them changed at the beginning of 2026, so most texts on the internet still state the old rule. This guide explains when a usage permit is needed, when a simpler document is sufficient, how to check this before signing, and what the lack of the document means for a mortgage.

What is a usage permit and what is its purpose

A usage permit is issued by the building authority that issued the building permit, after a technical inspection determines that the building was constructed in accordance with that permit, particularly regarding the fulfillment of basic requirements for the building (Art. 94, Para. 2).

For less complex buildings, the technical inspection does not determine the fulfillment of basic requirements (Art. 94, Para. 3), which significantly simplifies the procedure.

Two consequences that most often surprise buyers:

  • A building may be used only in accordance with the purpose established in the building permit (Art. 94, Para. 4). An apartment registered as business premises is not an apartment.
  • If a usage permit is not attached during the registration of the building in the land registry, the court automatically adds a note about this, and thus the usability of the building is considered not proven (Art. 107, Paras. 2 and 4).

That second point is what the buyer can check for themselves before signing anything.

When a new usage permit is not required

BuildingWhat the law recognizesArticle
Built by February 15, 1968It is considered built on the basis of a final building permit. The time of construction is determined by a usage permit for a building built by February 15, 1968, which the building authority issues upon request of the party.Art. 145
Building permit or other appropriate act issued by June 19, 1991It is recognized as a usage document, but with a certificate from the building inspection that no building inspection proceedings are in progress.Art. 131, Para. 2
Building permit or other appropriate construction act issued by January 1, 2014Instead of a usage permit, the building authority may issue a usage permit for a building constructed on the basis of a building act issued by January 1, 2014. Without a technical inspection.Art. 143.

In addition to those three cases, the decision on the derived state and the certificate of the derived state issued under previous regulations, as well as the decision on the derived state under the laws on dealing with illegally constructed buildings (Art. 131, paragraphs 2 and 3), are also considered acts for use.

For the simplified permit under Art. 143, three attachments are required: the construction act, an extract from the cadastral plan, and a geodetic survey of the derived state prepared by a licensed geodetic engineer. This survey is an item that carries cost and a deadline, so the question of who pays for it is part of the negotiations, not a formality.

For a building constructed by 1968, the time of construction is determined by the authority by inspecting the State Aerial Survey made before February 15, 1968, or another official cartographic base of the State Geodetic Administration (Art. 145, para. 4). The wording of that permit explicitly contains a note that the testing of the fulfillment of fundamental requirements for the building did not precede the issuance of the permit (Art. 146, item 4). Therefore: the permit confirms age, not construction quality.

When a usage permit is not issued at all

The three cases above talk about when a simpler document is sufficient. There is also a fourth, significantly different case: buildings for which an act for use is not issued at all.

Article 94, paragraph 1 links the obligation to the condition "unless otherwise prescribed by this Act". One such case is buildings and works for which it is not necessary to obtain a building permit. Which those are is prescribed by the minister through an ordinance (Art. 85, para. 4), specifically the Ordinance on simple and other buildings and works. Since there is no building permit for them, there is no technical inspection or usage permit.

Instead of a permit, there is its own document: a certificate from the competent administrative body that an act for use is not issued for the use of the building. The Act mentions it explicitly, as an attachment to the request for recording in the land registry, on equal footing with the usage permit (Art. 132, para. 2).

Whether a specific building belongs to that group is decided by the ordinance and the competent construction authority, not by an impression of size. The list has changed through amendments to the ordinance, so check the valid text and status for your building before relying on it.

How to check before signing

Three steps, from the fastest to the most thorough.

1. Look at the possession sheet of the land registry. If there is a notation that the usage permit has not been attached, that is a clear signal. If it has been attached, the notation states the body that issued the permit as well as the class, registry number, and date of issuance (Art. 107, para. 1). For buildings registered before January 1, 2014, the owner can have such a notation added later, at their own request (Art. 132). We explained how to get an extract in the text How to check real estate ownership.

2. Request the document from the seller, before the down payment. Ask specifically: which act for use exists and what is its date. “Everything is legal” is not an answer. Class and date are.

3. Check in the eDozvola system and with the construction authorities. The public part of the eDozvola system shows issued acts. For older acts and for the certificate from the building inspection from Art. 131, para. 2, an inquiry to the competent construction authority is still required, as not all older acts have been digitized.

The order is important: this check belongs to the step before the down payment, not after it. A broader list of steps is in the guide Apartment buying process step by step.

What the lack of a usage permit means for a loan

The lack of a usage permit does not automatically mean a rejection, but it does mean additional questions and additional time.

Banks differ. Some, when a property is registered without a usage permit, require a building permit with the main project along with the title deed. Others list only the title deed and sales contract in the standard list, so the question opens up later, during the appraisal.

Two things apply regardless of the bank:

  • The appraiser will request documentation. The appraisal is done based on the factual and legal state, and the notation from Art. 107, para. 2 is part of that legal state.
  • The buyer most often discovers this too late. The down payment has already been paid, contract deadlines are running, and obtaining the act depends on the seller and the construction authority.

That is why this is checked before the down payment. How much loan you can get and how banks calculate affordability, we explained in the guide Creditworthiness, and you can calculate the approximate amount in the creditworthiness calculator.

What the seller can do

If an act for use does not exist, the seller has a concrete path, not a dead end.

For a building constructed based on a permit issued by January 1, 2014, a request is submitted under Art. 143 with the three mentioned attachments. There is no technical inspection, so the deadline is shorter than for a regular permit, but a geodetic survey must be ordered and paid for.

For a building constructed by February 15, 1968, a request is submitted under Art. 145 along with an extract from the cadastral plan and evidence of the construction time available to the owner.

For permits issued until June 19, 1991, it is necessary to obtain a certificate from the building inspection. Check this part with the competent authority before promising it to the buyer in the contract, as deadlines and practices vary.

Frequently Asked Questions

Sources: Building Act, Narodne novine No. 155/2025, in force from January 1, 2026, Art. 85, 94, 107, 131, 132, 143, 145 and 146; Ordinance on simple and other buildings and works, Narodne novine No. 112/17, 34/18, 36/19, 98/19, 31/20, 74/22 and 155/23, which prescribes buildings and works for which a building permit is not required, and has been amended several times; eDozvola, Ministry of Physical Planning, Construction and State Assets. Data verified on October 28, 2026.

Documentation not right? See other options

If the act for use is missing and the seller does not want to resolve the issue, it is worth seeing what else is on the market in the same range.